Sunday, October 3, 2010

Putting it back together

After ripping out the shower Aaron (Allen) and I were covered in drywall dust and scum, desperately in need of a shower. Good thing the beach has one :) It was a bit chilly showering after dark, but it sure felt nice!
The most important step in getting it back together was making sure the mold didn't come back. We put plastic behind mold resistant drywall.

Hopefully that'll do the trick. Once the tub was back in place and leveled it was time for the fun part- putting the surround up. We were originally going to do tile, but after all that extra work, something simple seemed like a good idea. And it was. It looks great!

I thought not having a shower was bad! Next the TOILET had to come out! Good thing McDonald's is right around the corner- We had to take a little family trip down there before bed. :)
Fortunately the toilet went back on first thing in the morning once the grout was dry.


I love the tile we picked! I don't even want to put the vanity back in cuz it'll cover up part of the floor.

1 comment:

  1. Good Job guys. Aaron H should get sick more often, so the projects get done for him like this.
    I can't wait to see it some day.

    ReplyDelete