Sunday, September 26, 2010

Now on to the Bathroom


True to remolding form, one little project has turned into another moldy nightmare.
Our vanity imploded when it was removed. Fortunately the mold behind it bleached out pretty easily.
There were a few small tiles that need replacing in the shower, or so we hoped. Unfortunately when my brother ripped them out we discovered a very ugly sight.


So what could we do but some demo!

Because the mold had spread so far we decided ripping out all the tile and drywall was the only way to contain the situation.

And what did we find but more mold! The wall at the back of the tub is double layered because it separates us from our neighbors. The mold had managed to make its way right through both layers.




What does that mean? The tub comes out next so we can replace the 2nd layer of drywall. Oh boy, looks like we will be showering at the beach.


Kitchen

After some very detailed cutting

And placing


The kitchen counter is looking very close to complete.







We just need to add the molding to the front edge and then seal it. Hurray!

Monday, August 23, 2010

Transformation

Remember this?



Now it looks like this:

Sunday, August 22, 2010

Now that the floor is done, the new cabinets are in, and the doors have been put on, it is time for some countertops!
This like everything else is another slow processes.
Our tile saw was a great deal, but that is because it is pint size. No matter- Aaron is the master of all tools. We have an underlay sink with a curved edge which makes for some tricky cutting.
That and moving the faucet made this particular section extra time consuming. It is really nice to see some progress though- it is gonna be so pretty!

Monday, June 14, 2010

We did it!

Hurray! We finally finished the floor, our 2 month project :-/
We got all the remaining pieces of tile ripped up.

Aaron set up shop on our front lanai. He did some pretty tricky cutting using a circular saw instead of a table saw.

What a relief! We were slowly inching our way across the room from the living room to the kitchen, so the kitchen side has been plywood for a long time. Now I can walk over there without cringing every time I step on the rough floor.

Half of Joanna's room was unfinished, we got that done and put boxes on it to weigh it down.

We even got the last little spot done outside our bathroom door. I feels so good to walk around everywhere on nice smooth bamboo. The last while almost half the main living area was unfinished floor. Now that the floor is all the same the room feels so much bigger. Now I can have our dining room table delivered. Ahhh, loverly. :)
There are still piles of construction stuff in the middle of the room, when that's organized I'll post some better photos.


Next up is the kitchen counter tops!

Friday, May 21, 2010

long time no see

Since it has been so long since I have updated I'm sure you have been imaging us enjoying our beautifully completed condo...unfortunately that is not yet the case. We did get a good start on the floor,

but we discovered it is really slow going. We are gluing rather than nailing which is very messy (especially when I'm the one with the glue)

After a couple weeks of laying floor in our spare moments we managed to get about half the main living area done.

That was enough to get our couch down off its end and sitting in a normal position. That is our folly. Now that our living room is functional, progress has come to a dead halt. Hopefully the resurgence of my blog will also lead to progress on our condo!

Saturday, April 17, 2010

The love hate relationship with water

This week has felt like trying to walk in gale force winds. (Ironically it has been very windy this week)
Every little thing is taking sooo long! Tuesday I got just about all of the tile backing ripped off the floor. That pretty much did me in for the rest of the day! We got the plywood on the counter,

and the hole cut for the sink.


That's when things slowed down. We were going to reuse our old sink in the new location, but it turned out to be too big. That meant searching for a new sink. We were disappointed to discover that double sinks don't fit in 30" cabinets. Phooey. We did find a very nice extra deep one though. Of course since it was extra deep it required moving the plumbing Aaron just installed.
He got that sorted and went to put the faucet on. Turns out we needed a new one of those too!

But after two weeks without a kitchen sink we finally got it installed! The best part of it was Friday night I came home expecting to go faucet shopping, and lo and behold Aaron had already picked one out and got it installed before I came home!! Hurray!

In the meantime, Wednesday morning I discovered a strange lump on our bathroom ceiling...and water at the bottom of the wall. Not good!


The water tank in the upstairs unit burst and was leaking through the floor, through our ceiling, down our wall, into our bedroom, through our floor and into the parking garage below! Ahhh!

The unit above is vacant so getting in was somewhat of an issue. We did get in though and now with the water turned off it looks like things are drying up. What is to become of our wall, I have yet to find out...

I must take a moment to reflect on the blessing it is to be born and raised in the country(s)that I have been. There are so many people in the world that don't homes like we do, or running water, much less a kitchen sink. Although it is inconvenient and uncomfortable to live in a construction zone, I just have to take a few seconds each day and remind myself how blessed I truly am.